Download IEEE 1120-2004 - IEEE Guide for the Planning, by IEEE PDF

Read or Download IEEE 1120-2004 - IEEE Guide for the Planning, Design,Installation, and Repair of Submarine Power Cable Systems PDF

Similar nonfiction_1 books

Heaven's Arsenal Hell's Destruction: A Book On Spiritual Warfare

Leticia Lewis is an ordained minister of the Gospel referred to as by means of the Lord into the workplace of a Prophetess. Her ardour is instructing the physique of Christ their authority in Christ Jesus which provides us the victory in each scenario. Prophetess Leticia Lewis is the founding father of the foreign Covenant Christian Chamber of trade and Majestic Ministries overseas.

Facets of Unity: The Enneagram of Holy Ideas

Submit 12 months notice: First released in 1998
------------------------

Facets of cohesion provides the Enneagram of Holy principles as a crystal transparent window at the actual truth skilled in enlightened cognizance. right here we're not directed towards the mental varieties however the larger religious realities they replicate.

We become aware of how the disconnection from every one Holy notion ends up in the advance of its corresponding fixation, hence spotting every one varieties deeper mental middle. realizing this middle brings each one Holy thought nearby, so its religious point of view can function a key for unlocking the fixation and liberating us from its barriers.

Additional resources for IEEE 1120-2004 - IEEE Guide for the Planning, Design,Installation, and Repair of Submarine Power Cable Systems

Example text

IEEE Std 1120-2004 Planning, Design, Installation and Repair of Submarine Power Cable Systems [B28] R. Arnold, A. Homer, B. Riot, “Seabed Repair Facility of the Cross Channel Cables,” CIGRE 21-05, 1986. Arnaud, A. Bolza, F. Magnani, E. Ochini, “Long Island Sound Submarine Cable Crossing 345kV, 750MVA,” CIGRE SC21, WG 306, 1992. [B30] K. Bjorneklett, E. V. Laengen, “Installation of 300 kV HV AC Underground Power Cable – Part of the Main Power Supply for Kollsnes Gas Treatment Plant, Troll Phase 1 Onshore Plant and Troll Phase 1 Power Offshore Cable,” CIGRE 21/22-06, 1996.

3 Minimum bending radius Care should be taken that all equipment and installation methods do not violate the minimum bending radius of the cable. This includes: ⎯ Reels and coils ⎯ Sheaves, rollers, and fantail ⎯ Tensioning equipment ⎯ Turntables 25 Copyright © 2005 IEEE. All rights reserved. 6 Cable protection In a submarine project, the cost of the cable protection is commonly significant. ) should be considered as early as possible in the project implementation. This clause outlines a number of ways to protect a cable from physical damage.

3 Production testing A cable may be tested after it is produced to demonstrate it is electrically and mechanically suitable for use. The same organizations mentioned in the previous clause provide testing protocol. 4 Pre-installation testing Electrical tests are normally performed prior to installation to assure that the cable was not damaged during transportation. 1 Inspection A post-installation survey may be done to assure the cable is lying properly on the bottom and/or adequately buried. An as-built survey may be useful if the cable has to be repaired or retrieved, another cable laid over or near it, or construction work done around it.

Download PDF sample

Rated 4.92 of 5 – based on 39 votes